A New Direction for Affordable Housing

Ryan Gerrard / 05 April 2023

Ensuring that everyone has access to affordable and quality housing is fundamental to building a stable community. The UK government pledged in 2021 that up to 180,000 new and affordable homes would be built annually moving forward, however due to the rising costs of construction and the project timeframes surrounding traditional builds, the target is one that could be deemed as ambitious.

With the rising pressure to build new affordable homes as quickly and as cost efficient as possible without comprising on safety and quality, working with CPG UK, could be the perfect solution that local authorities and developers within the United Kingdom are looking for.

CPG UK prides itself on being able to deliver products suitable for all six-side of the building envelope to any site around the country. Supported by an industry leading technical services team, no project is too big nor too small, when it comes to working with our team of experts.

Here at CPG UK, we believe there are three vital pillars of construction: speed of build, cost efficiency and compliance. Armed with a portfolio of brands that support all these pillars with their extensive product ranges, we are poised to support the future of construction within affordable housing.

Speed of Build:

As the UK has insufficient stocks of affordable homes, speed is of the essence when it comes to new social housing schemes, and this is where CPG UK has a significant advantage over other product manufacturers. With the ability to now offer Nudura, the leading ICF brand, to the UK housing market – we can work with developers to ensure that tight project timelines are delivered, whilst remaining compliant and energy-efficient.

Once transported to site, Nudura Solid Insulated Wall Structures lock together, with our patented Duralock technology, to build walls far quicker than timber frame or traditional brick. When the system is interlocked and in-filled with concrete, it creates a solid monolithic, permanently insulated wall, which also give low air permeability. The simplicity of the system means that construction is quick and does not require skilled labour, such as bricklayers – CPG UK can even recommend a network of Nudura approved installers.  

On average it would take just twenty-one days to make the structure weather tight and externally render a pair of two-bed semi-detached house – meaning time to complete the build is fast.

Furthermore, cost delays due to inclement weather is not an issue when building with Nudura as construction can continue during these times.

When building with Nudura, one should also consider the external wall finish utilised. CPG UK is proud to offer Dryvit ICF500 Render systems, as well as our Dryvit EWI systems for existing housing stock, as part of our portfolio of solutions. With a single point of contact within CPG, developers or local authorities can work closely with our team to ensure that trades are able to follow each other within a realisable timeframe – meaning projects can be completed to agreed development schedules.

Find out more about the speed of build with Nudura here.

Cost Efficiency:  

Keeping costs low is a priority on all building schemes but none more so than on social housing projects where budgets are constrained. Building with CPG UK, offers a cost-efficient solution for both developers and future occupants.

Utilising your network of skilled tradesmen, CPG UK can quickly and easily train operatives to build with Nudura, Render with Dryvit systems and install airtightness solutions utilising a range of our Illbruck products. Thus, reducing costs associated with the reliance on specialist tradespeople and helping contain project costs.

Our team will also work with you to reduce the likelihood of potential project delays that would subsequently increase the budget and impact on profitability. As the cost of construction materials continue to rise, CPG UK offers a price competitive alternative to affordable housing.

More importantly, our commitment to cost efficiency stems further than just to the developers. Utilising a CPG controlled super-structure means that occupants could pay up to only £104 per annum on energy costs*.

Find out more on the cost-efficiencies of building with CPG UK here.

Compliance:

Building safety and compliance is always at the forefront of construction when it comes to working with CPG UK. Our product brands are fully compatible and offer BBA accredited systems for developers. Tested in accordance with latest building regulations, our product ranges offer peace of mind when it comes to builds.

Supported by an industry leading, in-house technical team, developers can be assured that the correct systems are utilised within projects across the UK.

Summary:

CPG UK’s goal remains to provide developers and local authorities with a high-quality super structure that in turn reduces energy costs, and will contribute to a more sustainable, safer, and comfortable living environments.  With the ability to support your projects from design stage through to completion, CPG UK is proud to offer a new direction for affordable housing.

To find out more about CPG UK’s affordable homes offering please visit here.